The Challenge

IMI CCI has high pressure turbine bypass, hot re-heat turbine bypass valves along with the associated spray water valves installed at the combined cycle power plant in North America.
お客様は、発電所での水撃作用による設置済みバルブへの破損を解決するため、IMI CCIに連絡をとりました。水撃作用によって配管が曲がったり、ハンガーの損傷やその他の故障で発電所の操業停止を招き、数百万ドルもの損失が出ていました。​

The Solution

お客様からサポートの依頼を受けて、IMI CCIのチームはただちに行動を開始しました。

An IMI CCI Valve Doctor® immediately visited the site to evaluate the impact of the water hammer phenomenon on the IMI CCI valves. The plant walk down enabled the Valve Doctor® to identify multiple issues: damage to valve accessories, control logic problems in the distributed control system and valve controllability. After detailed root cause analysis, IMI CCI recommended a system solution to address the issues with controllability and control logic. The recommended solution included an upgrade from the existing standard smart positioner with volume booster and lock up valve to the high capacity IMI STI Fastrack positioner. The solution also included a change in the control logic of the interlock system in the distributed control system.

これは未計画の操業停止であったため、IMI CCIのチームはソリューションを迅速に提供して発電所をなるべく早く稼働状態に戻すことの重要性を理解していました。チームは最短の時間でアップグレードソリューションの提供と設置、試運転を終わらせるべく、部門の壁を超えて力を合せました。
現場の問題に素早く対応し、最短の時間で解決策を実行に移す当社の能力にお客様は感銘を受けました。

このお客様はOEM企業と提携することの利点を理解し、この現場に設置された資産の管理をIMI CCIに委託するよう追加の発注を行いました。​